How it started

In 2020, I made the decision to construct a purpose-built studio in my garden from which to work.  Equipped with the latest in soundproofing and technology, I am in love with my new dedicated space and I’m really pleased to see how much my clients love it and how at home and relaxed they feel. I captured the process of it being built. Take a look at the journey below:

I am based near Alton, Hampshire, ideally located for face-to-face clients in the Hampshire, London, Surrey, Wiltshire, Sussex and Berkshire areas. However, over the past 10 years, I have increasingly coached singers online, working with professional and aspiring professional singers, including performers as far afield as China and the US.  My studio is a warm, welcoming safe space to work together and whether via the internet or in person, the quality of teaching, and care and progress I make with my clients is exactly the same.

The beginning

Start of the build

My Studio broke ground on 28th April, As well as the groundworks starting, there was exciting decisions to make about the acoustic panelling.

The building works began! May 1st is when the home studio project really got underway.

By Mid-May, the size and shape of the studio began to rise out of the ground: 5 x 4 Metres, giving my clients a great space to sing freely!

By July 13th, the cedar cladding was mostly on, the doors and windows arrived and the roof was going on.

Halfway through the build

Finished

Completed Studio

July 30th and the exterior of the studio was complete. 

August 8th and the studio was complete with the finishing the touches that turned it from a shell into the warm, professional and brilliantly equipped space from which I now teach.

Start of the project

My Studio broke ground on 28th April, As well as the groundworks starting, there was exciting decisions to make about the acoustic panelling.

April 28th, 2020

Building works begin

The building works began! May 1st is when the home studio project really got underway.

May 1st, 2020

Starting to come together

By Mid-May, the size and shape of the studio began to rise out of the ground: 5 x 4 Metres, giving my clients a great space to sing freely!

May 14th, 2020

Exterior nearly done

By July 13th, the cedar cladding was mostly on, the doors and windows arrived and the roof was going on.

July 13th, 2020

Exterior complete

July 30th and the exterior of the studio was complete.

July 30th, 2020

Studio complete

August 8th and the studio was complete with the finishing the touches that turned it from a shell into the warm, professional and brilliantly equipped space from which I now teach.

August 8th, 2020